ProductsIntelligenceLicensingAnalyst AccessPricingMethodologyContact
ENERGY, POWER & COMMODITIES

OFAC compliance

OFAC sanctions compliance in the Energy, Power & Commodities sector sits under active enforcement pressure, with the U.S. Department of the Treasury's Office of Foreign Assets Control issuing sector-specific guidance on Russian energy transaction restrictions and secondary sanctions exposure that directly affects oil traders, LNG counterparties, and power infrastructure deals. The U.S. Department of Justice and the U.S. Department of Commerce's Bureau of Industry and Security have both signaled coordinated action on evasion schemes routed through commodity trading intermediaries. Compliance teams in this sector are currently auditing counterparty chains against the price cap coalition rules and re-screening vessel ownership structures that changed hands post-2022.

Watch

  • OFAC's Russia-related General Licenses: expiration dates and scope changes affecting energy carve-outs
  • Secondary sanctions exposure for non-U.S. commodity traders financing capped-price crude shipments
  • BIS export controls on dual-use equipment intersecting with power infrastructure project finance
  • Beneficial ownership re-screening requirements triggered by SDN list additions in the tanker fleet space

Recent material activity in Energy, Power & Commodities

A selection of recent published briefs; this is not a complete archive.

  • Sep 24, 2026MATERIAL

    DOE / EIA Energy Policy & Data release pending Cresthaven Analytics full analysis: Energy Department Announces Speed to Power Investments Across 26 States to Lower Electricity Costs and Improve Grid Reliability

    DOE / EIA Energy Policy & Data published a regulatory release titled 'Energy Department Announces Speed to Power Investments Across 26 States to Lower Electricity Costs and Improve Grid Reliability'. Cresthaven Analytics…

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    NRC proposes wholesale revision of reactor licensing, decommissioning, and operational oversight regulations under Executive Order 14300

    On September 24, 2026, the NRC published a proposed rule to revise its reactor licensing, decommissioning, and operational oversight regulations. The proposal implements Section 5 of Executive Order 14300, which directs …

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    EPA reopens public comment on 2024 Texas SIP disapproval covering emissions during power plant maintenance activities

    The EPA granted reconsideration on May 11, 2026 of its December 20, 2024 disapproval of a Texas state implementation plan governing visible emissions and particulate matter during planned maintenance, startup, and shutdo…

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    EPA proposes consent decree setting deadlines for overdue California and Colorado ozone SIP final actions

    The EPA published notice on September 24, 2026 of a proposed consent decree in Center for Biological Diversity and Center for Environmental Health v. Lee Zeldin, No. 4:25-cv-10007-JST. The decree would resolve citizen-su…

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    FERC opens intervention window on Transcontinental Gas Pipe Line Company natural gas pipeline application

    FERC published a notice on September 24, 2026 opening the intervention deadline period for a Transcontinental Gas Pipe Line Company, LLC certificate or abandonment application. The notice establishes the procedural windo…

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    FERC opens scoping period for LED Enterprises Yuma Pipeline Project environmental review

    FERC issued a notice on September 24, 2026 opening a public scoping period for the proposed Yuma Pipeline Project by LED Enterprises, LLC. The notice solicits comments on environmental issues and announces a public scopi…

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    FERC accepts GR Catalyst One LLC hydropower application and opens intervention and protest period

    FERC accepted GR Catalyst One, LLC's application for filing on September 24, 2026, opening a formal proceeding for the project. This acceptance initiates the intervention and protest window, establishing the procedural r…

    Read a full sample brief →
  • Sep 24, 2026MATERIAL

    AEMC releases draft rule enabling Commonwealth's $40 million EV charging infrastructure program across regional and urban sites

    The AEMC released a draft rule on September 24, 2026 to support the Commonwealth Government's Accelerating EV Charging Program. The draft targets two specific gaps: regional charging blackspots and high-density kerbside …

    Read a full sample brief →
  • Sep 23, 2026MATERIAL

    EPA proposes to approve North Carolina second 10-year ozone maintenance plan for Charlotte-Rock Hill area through 2035

    EPA published a proposed rule on September 23, 2026 to approve North Carolina's second 10-year maintenance plan for the 2008 8-hour ozone standard covering the bi-state Charlotte-Rock Hill area. The proposal incorporates…

    Read a full sample brief →
  • Sep 23, 2026MATERIAL

    FERC opens intervention deadline for High Island Offshore System pipeline application

    The Federal Energy Regulatory Commission published a notice on September 23, 2026 establishing an intervention deadline for an application filed by High Island Offshore System, L.L.C. The notice opens the formal particip…

    Read a full sample brief →